Kvalitetssikring Danmark ApS
Knowledge

Knowledge base: DS1140 and quality assurance

Practical articles on DS1140, control plans, control reports, structural classes and structural documentation – written for contractors, trade contractors and clients.

Technical overview · Free checklistConstruction documentation – from agreement to handover

DS1140 and quality assurance

What is DS1140?

DS1140 is Denmark's standard for controlling load-bearing structures. A practical explanation of what it requires and who it applies to.

Read article

Structural classes KK1-KK4 explained

Structural classes KK1-KK4 explained: your building's class decides how extensive the DS1140 control must be, and what that means for you.

Read article

Self-inspection vs. independent control - what's the difference?

Self-inspection and independent control complement each other under DS1140. See the difference, and when independent control becomes mandatory.

Read article

What is a B2 control plan?

B2 is the formal name for the control plan under the quality assurance order. See what it must contain, and why it's so often sent back.

Read article

What is a B3 control report?

The B3 control report documents that the control described in the B2 plan was actually carried out. See what it must contain, and why it often has gaps.

Read article

What is A5 / as-built documentation?

A5 as-built documentation shows what was actually built, including deviations. See what it requires, and why it's the last piece of the DS1140 process.

Read article

Control type, control level and control scope in a DS1140 control plan

Control type, level and scope are the three things every entry in a DS1140 control plan must establish. See the difference, with concrete examples.

Read article

What does BR18 require of static documentation?

BR18 requires static documentation for almost every building with load-bearing structures. See what the requirement covers and when it applies to you.

Read article

Why do DS1140 cases get rejected - and what do you do about it?

Control plan rejected, B3 with gaps, or missing A5? See the most common reasons DS1140 cases stall - and how they get fixed.

Read article

DS1140 for contractors: who's responsible for what?

Under DS1140, the contractor holds main responsibility for self-inspection and B3 documentation on site. See what that means, and where it slips.

Read article

DS1140 templates: what can you use yourself?

A free template can structure your DS1140 documentation, but it doesn't fill itself in. See what a template can and can't do, and when you need help.

Read article

New construction rules

New construction rules in Denmark and what your project should check

Review new construction rules in Denmark, effective dates and documentation. Check the main changes and clarify project responsibilities before work.

Read article

A contractor stop order on a Danish construction site

Understand a contractor stop order in Denmark, affected work and documentation. Check the authority process and organise follow-up before restarting.

Read article

Asbestos rules for Danish construction projects

Check asbestos rules in Denmark, company authorisation, training and documentation. Clarify the planned activity with a competent specialist before work.

Read article

Selective demolition in Denmark and the 250 square metre threshold

Understand selective demolition in Denmark, the 250 m² threshold and project roles. Check applicability, authorisation and planning before work starts.

Read article

The demolition plan and the client’s MRK responsibilities

Organise a demolition plan and clarify the client’s MRK role in Denmark. Review appointment, project information and updates before covered work begins.

Read article

BR18 climate requirements and the documentation your project needs

Review BR18 climate requirements, project scope and documentation. Separate building and construction-process limits and agree the calculation inputs.

Read article

A4/A5 documentation for the construction process

Organise A4/A5 documentation for transport, energy and material waste. Agree records, units and reporting responsibilities with the calculation specialist.

Read article

From the archive

2 March 2025

Why did it become a success?

Want to save money … and time? Our success is built on good communication and good cooperation.

Read article

27 March 2025

Links to the new rules

Keep up with developments. The timeline shows when new rules, laws, norms and standards changed – including the certified structural engineer's role in BR18.

Read article

2 March 2025

New app on the market for tradespeople

The new quality-assurance app from our sister company KS Assurement ApS – tailored to small and medium-sized trade contractors.

Read article

DS1140 structural documentation? Contact us, it's free.

Book a conversation where we make sure you get the best deal.

Choose between prices per project or the cheaper annual agreement.