Documenting the climate impact of the construction process

Requirements for transport, site activities and execution under BR18

Documenting the climate impact of the construction process is part of the BR18 climate requirements. The requirement covers transport to and from the site as well as activities and energy use during execution. In the LCA calculation, these parts are referred to as module A4 and A5. Covered projects have a separate limit of 1.5 kg CO₂e/m²/year for the construction process.

· Kvalitetssikring Danmark

From 1 July 2025, BR18 requires the climate impact of the construction process to be documented and limited. The requirement covers transport to and from the site as well as relevant activities, energy use and waste streams during construction.

In the climate calculation, these activities are referred to as LCA module A4 and A5. The labels must not be confused with A4 and A5 in the structural documentation.

A4 and A5 can mean different things in construction

In the context of the climate impact of buildings, A4 refers to transport and A5 to the construction and installation process in the building’s life cycle.

This must not be confused with the labels A4 and A5 in the structural documentation, where A5 covers “Structure as built”.

On this page, A4 and A5 are used only as labels for LCA modules in the climate calculation.

At a glance

  • The documentation concerns the construction process (LCA module A4 and A5), not the whole building assessment.
  • Useful inputs can include transport, energy, fuel and material-waste information.
  • The calculation specialist should define the required records and permitted assumptions.
  • An invoice or photograph needs context before it becomes a usable input.

Who supplies the construction process documentation

The building client and advisers should agree who prepares the climate calculation. Contractors and subcontractors then supply project data within their agreed scope. Documenting the climate impact of the construction process works best when responsibilities are clear before deliveries, equipment use and waste transport begin.

Ask the calculation specialist for a concise data list with units and periods. Identify which suppliers can provide the records and who gathers them. A general request to the site for all climate information is rarely enough. The documentation needs information that matches the method and can be traced to the relevant activity. So test a single delivery early, so that gaps in the request are spotted before the next period.

Set the boundary for the construction process documentation

Agree which activities and reporting periods belong to the project’s assessment. Transport, temporary installations and shared equipment can raise allocation questions. The documentation should record how the specialist expects those questions to be handled, rather than leaving each subcontractor to invent its own approach.

Write down the reporting boundary and keep it with the request sent to suppliers. If equipment or a delivery serves several projects, identify the information available and have the basis for allocation clarified professionally. When documenting the construction process, consistency matters more than a large volume of files with different periods and units. A recipient must be able to understand which work the information covers and which activities fall outside that particular record.

Capture transport information with a usable reference

Ask which transport inputs the calculation method requires and whether supplier statements or other records provide them. Where project-specific data is used, connect the transport information to the material, shipment or activity. The transport documentation should make the reference understandable to someone who was not present when the delivery arrived.

Check units and descriptions before accepting a table. A distance, a quantity and vehicle information answer different questions. Keep the original statement and let the responsible specialist explain any conversions. Do not turn an incomplete delivery note into a precise result by adding assumptions that nobody has assessed. Make missing information visible so it can be obtained or handled according to the agreed method.

Gather energy and fuel data

Agree how electricity, heating and fuel for the relevant activities will be recorded. The source, unit and period must be clear. Depending on the method, the documentation may draw on meter data, supplier information or equipment records. Clarify what is needed with the specialist before choosing a template that staff will use every week.

Where a meter serves several activities, describe the shared supply and keep the basis for allocation. Distinguish measurements from estimates and permitted standard values. The documentation should preserve that distinction in the material sent for calculation. A spreadsheet with a single total and no period or unit is difficult to review. Also record any changes in supply, so two meter readings do not cover the same consumption by mistake.

Connect waste information to the activity

Ask how material waste and its handling enter the assessment. Agree the records needed from the performing companies and waste recipients. The documentation should connect a quantity and material description to the project, reporting period and source rather than relying only on a photograph of a container.

Review the descriptions used across documents. A waste statement, delivery note and material list may use different names for the same material. Get differences that affect the calculation clarified, and keep corrections traceable. Good documentation of the construction process helps the specialist connect the information without guessing what the site intended. If a material cannot be identified with certainty, show it as an open question rather than hiding it in a combined entry.

Missing inputs in the construction process documentation

Keep a short list of missing information with a person responsible and a deadline. State whether what is missing is a statement, a unit clarification or a decision about the method. The documentation is easier to complete when the next action is specific enough for the person responsible to carry it out without further explanation.

Do not enter zero because a figure is missing. Ask the calculation specialist whether a permitted standard value or another documented approach is relevant. The guidance allows different approaches, but it provides no basis for an undocumented guess. Keep the choice with the documentation so later review can follow it. Use the same description of the gap in the list and in correspondence with the supplier, so follow-up stays manageable.

Review records during the project

Test the reporting on the first relevant period. Check whether suppliers can provide the requested units and whether the team can connect the records to the project. Adjust the request early if it produces unusable data. Documenting the construction process should be a manageable task, not a collection exercise that only starts at the completion notice.

At each review, compare the information received with the data list and upcoming activities. Keep the issued set and later corrections identifiable. Ask the specialist to resolve inconsistencies before the final calculation. The documentation is more useful when questions are resolved while the supplier and site staff can still explain the original activity. Record who accepted a correction and which statement it replaces.

Keep the assessment and source data separate

The calculation specialist converts suitable inputs into the regulatory assessment. Retain the input records, assumptions and issued result in linked but distinct areas. Documentation of the construction process does not, on its own, demonstrate that the construction-process limit has been met. The applicable calculation and review still need to be completed.

Also distinguish these modules from A5 as-built in the structural documentation. The labels are similar, but the tasks have different purposes. Keep structural records in their own structure. Climate documentation for LCA modules A4 and A5 should have a title that shows the climate context, especially when the same team works on both deliveries. This makes it easier for the recipient to ask for the right material and for the project to allocate responsibility correctly.

Effective date and source check

The construction-process climate requirements discussed here were introduced from 1 July 2025 for covered projects. Sources were checked on 9 October 2026. Recheck applicability and the accepted data approach before using documentation of the construction process climate impact from another project as a template for the current case.

Frequently asked questions

Are invoices enough?

They can provide useful inputs if the project, period, quantity and unit are clear. Documentation of the construction process may need additional information or a documented allocation. Ask the calculation specialist which records meet the selected method.

Must we collect every possible measurement?

Agree the relevant method and required inputs first. Official guidance provides different documentation routes. Collect useful records for that approach, rather than asking the team to gather data that will not be used.

Can photographs replace consumption records?

Images can explain an activity or equipment arrangement. They usually do not establish consumption quantities on their own. Use photographs as supporting context within the construction process documentation, with suitable quantitative records where required.

Is LCA module A5 the same as A5 Structure as built?

No. The A4 and A5 climate modules concern the construction process. An A5 structural document has a different purpose. Keep the titles and delivery responsibilities distinct to avoid sending one instead of the other.

General professional information. The individual project may require legal or technical assessment. The suggested workflows do not replace applicable requirements or competent specialist instructions.

Sources checked 9 October 2026. Technically reviewed by Kvalitetssikring Danmark ApS.

Our DS1140 services

DS1140: structural documentation, control plans and consulting

Get a quote for your DS1140 project

Read more in our knowledge base

New construction rules in Denmark and what your project should check

An overview of new construction rules, dates and documentation for your project. See the key changes and clarify responsibilities before the next activity.

Read article

Contractor stop orders on site and the follow-up they require

Understand contractor stop orders, affected companies and follow-up on orders. See which records to gather and clarify the process before restarting.

Read article

Asbestos rules and documentation in Danish construction projects

Get an overview of asbestos rules, authorisation, training and documentation. Clarify the specific activity with a competent specialist before work starts.

Read article

Selective demolition in Denmark and the 250 square metre threshold

Clarify selective demolition, the 250 m² threshold, authorisation and transitional rules. See what to investigate and agree before demolition starts.

Read article

The demolition plan and the building client’s responsibility for the MRK

Get your demolition plan, MRK and the client’s responsibilities in order. See how to clarify roles, information and follow-up before covered demolition.

Read article

BR18 climate requirements and the documentation your project needs

Clarify BR18 climate requirements, building type and documentation. See how building and construction process differ, and agree the calculation basis.

Read article

Coordinate the documentation tasks

Agree climate inputs with the calculation specialist. Discuss structural execution records with KS Danmark where relevant to its services. Identify shared project references while keeping the two assessments and their responsibilities separate.