Case 01 · Design-build contract review · Southern Funen
Description

Kvalitetssikring Danmark helped a building owner in southern Funen get a design-build (turnkey) contract reviewed for the construction of a new commercial property.

The challenge

The client didn't trust the draft design-build agreement. It wasn't clear which risks the contract actually carried — making it hard to sign with peace of mind.

The solution

We reviewed the entire contract basis so every risk was disclosed, and then had the contract adjusted. The building owner could confidently make the right decision and sign — the project is now going through authority approval.

«Every risk was disclosed, and the contract basis was then adjusted so I once again had the peace of mind to make the right decision. The contract is signed, and we are now in the middle of the authority-approval process.»
Hans C. Bukkehave — Building owner
Tømrerfirmaet Ulrik Fyrsterling A/S

Tømrerfirmaet Ulrik Fyrsterling A/S

Case 02 · Version tracking & AB 18 claim · Master carpenter
Description

Kvalitetssikring Danmark helped a master carpenter with a new kind of structure and systematic tracking of version changes over an extended period.

The challenge

The project material kept changing over a long period, and without a structured record of the version changes it was unclear what the carpenter was actually entitled to under AB 18 — a far from insignificant claim was at risk of being lost.

The solution

With the new structure and consolidated documentation of every version change, the claim could be substantiated under AB 18 — and it was carried through and approved.

«Kvalitetssikring Danmark helped me with a new kind of structure and the collection of version changes over an extended period, securing what I was entitled to under AB 18. Had I not known Kvalitetssikring Danmark, I would neither have known about nor succeeded in getting this far from insignificant claim carried through and approved.»
Ulrik Fyrsterling — Master carpenter
HDJ Kloak & Entreprenør ApS

HDJ Kloak & Entreprenør ApS

Case 03 · DS1140 after bankruptcy · Design-build project
Description

The design-build contractor went bankrupt — leaving the subcontractor unpaid for DS1140 material already produced.

The challenge

After the design-build contractor's bankruptcy there was no prospect of payment for the DS1140 material already produced. The value of the work risked being lost in the bankruptcy estate.

The solution

Kvalitetssikring Danmark helped secure the completed DS1140 material after the bankruptcy. The material was capitalised, and through negotiation in the run-up to the occupancy permit a fair amount was released.

«Kvalitetssikring Danmark helped me secure the material I had produced in connection with DS1140 after the design-build contractor's bankruptcy. The material was capitalised, and a fair amount was released in the negotiation leading up to the occupancy permit.»
J. Pedersen — HDJ Kloak & Entreprenør ApS
DS1140 documentation and control of steel structures

DS1140 – Completing documentation for a steel contractor

Case 04
Description

KS Danmark was contacted by a steel contractor who needed help to complete an ongoing DS1140 case. There were outstanding comments on the documentation that required follow-up, and the A5 material had to be completed so the case could be taken forward in the agreed documentation flow.

The challenge

When a DS1140 case is already under way, it is important first to get a clear overview of the existing documentation. What has already been dealt with? Which comments are still open? And what is missing before the remaining documentation can be completed? For the steel contractor, the need was therefore not to start the whole process again, but to identify and deal with the specific outstanding items.

The solution

KS Danmark reviewed the available material and created an overview of the remaining issues. The engineer’s comments were then followed up, and the necessary documentation was handled and structured. On this basis, the A5 material was completed so the documentation could be taken forward in the agreed DS1140 flow.

Read the full case
DS1140 control and documentation of timber structures

DS1140 – When control uncovered more than documentation

Case 05 · Timber structures · Design issue · Timely response
Description

KS Danmark was brought in on a classic DS1140 assignment concerning the execution and documentation of timber structures. During the work, an issue was found in the project material that called for attention. The issue did not necessarily fall within the contractor’s design responsibility, but it was an issue the contractor had become aware of, and which therefore should not simply be ignored.

The challenge

When a contractor becomes aware of a possible problem in the project basis, it can be crucial to respond. The contractor should not take over the designer’s responsibility or start redesigning a structure that others are responsible for designing. But that does not mean you should carry on working without responding to an issue you have become aware of. KS Danmark therefore recommended that the contractor bring the issue to the consultant’s attention and make sure the enquiry was documented.

The solution

The contractor responded and brought the issue to the consultant’s attention. The problem was thereby placed with the relevant designing party, who could carry out the necessary technical assessment. The issue was subsequently dealt with, and it turned out that the structure had to be changed. The contractor had thus raised the problem before work continued on a basis that subsequently turned out to need changing.

Read the full case
Project review and technical construction review before a design-build contract

Before the design-build contract – bring the risks to light before they become part of the agreement

Case 06 · Project review · Design-build contract · Risk assessment · Technical construction support
Description

A new client in Jutland contacted KS Danmark on the recommendation of an existing client on Zealand. The client was facing a larger construction project than those he had previously carried out, and therefore wanted technical construction support to have the project material reviewed in connection with a design-build contract. The aim was to create a complete overview of the issues in the project and contract basis that the client ought to know about and take a position on before the project went any further.

The challenge

On a larger construction project, the project material can contain technical, contractual and execution-related issues that may later affect the project’s finances, quality and delivery. The client therefore wanted to shed light on potential risks, unclear issues or issues requiring particular attention, interfaces, matters needing clarification, possible pitfalls and relevant suggestions for adjustments or clarifications. The goal was not to remove every risk from the project, but to give the client a better basis for decisions and greater peace of mind about the upcoming construction project.

The solution

KS Danmark was asked to review the project material from a technical construction and practical execution perspective. The review is to create a structured overview of identified risks and points requiring attention, as well as the issues where the client would benefit from seeking clarification or considering adjustments before the project goes further. This gives the client the opportunity to make decisions on a better-informed basis, rather than discovering the problems only during execution.

Read the full case
DS1140 structural sections and control sections on a main contract

When many structural sections led to unnecessary administration

Case 07 · DS1140 · Structural sections · Control sections · Main contract · Optimisation
Description

On a main contract, KS Danmark found that the project basis was structured with a large number of structural sections. The division could seem logical at first glance from the design side, but in the execution and control phase the structure had a practical consequence: a large number of structural sections could lead to a correspondingly larger number of separate control and documentation processes. That meant more administration for the contractors, the inspectors and the consultants who would subsequently receive and review the documentation.

The challenge

A structural section is not just a heading in the project material. The division affects how control and documentation are structured throughout the project. If the project is divided into more structural sections than necessary, it can lead to an unnecessarily heavy documentation process with more separate reports and repetition in the control work. KS Danmark therefore assessed whether some of the structural sections described could, from a technical point of view, be handled in a more appropriate way.

The solution

KS Danmark took up the structure with the relevant engineer. The review showed that some of the items set up as separate structural sections could be structured as control sections under a relevant structural section, where this was technically possible and could be accepted within the project’s control basis. This did not change the fact that the relevant checks still had to be carried out and documented. What it did change was the way the documentation was organised. The result was a simpler structure with fewer separate documentation processes.

Read the full case