B3 control report โ documenting completed checks
The B3 control report documents that the checks set out in your B2 control plan were actually carried out - with date, who performed them, the result, and any deviations. Without a B3 report kept current throughout the build, the structural engineer can't see whether control has actually taken place, and the project risks stalling at handover. We build the B3 report progressively during construction, so the documentation is complete by the time you hand over.
What a B3 control report is
Where the B2 control plan sets out what needs to be checked, the B3 control report documents that it actually happened. The report follows the control plan's points one by one and records when the check was carried out, who carried it out, and what the result was.
The report isn't a one-time document - it's built up progressively, as the control points from the B2 plan are completed on site.
What the report needs to contain
For every control point in the B2 plan, the B3 report needs to show the date of the check, who carried it out, and a clear result - approved, or a deviation with a description of how it was handled.
If a control point from the B2 plan is missing from the B3 report, a gap appears in the documentation that the structural engineer typically catches late in the process - often closer to handover, when it's more expensive to fix.
The challenge of keeping the report current
Most projects we take over midway are missing exactly this - an up-to-date B3 report. It usually happens because responsibility for documenting the control is spread across several people on site with no single overview. We fix that by keeping the documentation in one place and following up progressively as the work moves forward.
How KS Danmark helps
We build and maintain the B3 control report throughout the construction period, matched against your B2 plan, so you can always show how far the control has progressed. If there are gaps in an existing report, we catch up and close them before handover.
Frequently asked questions
What's the difference between a B2 control plan and a B3 control report?
B2 sets out what needs to be checked. B3 documents that it was actually done.
When does the B3 report need to be finished?
It's built up progressively during construction and needs to be complete by handover.
What happens if control points are missing from the report?
The structural engineer will typically reject handover until the missing points are documented.
Can you take over a report that's already underway?
Yes, we review the existing report against the B2 plan and close any gaps.
Related pages
The control plan under DS1140
The control plan is the core of your DS1140 documentation. See what it must cover, how B2, B3 and A5 connect, and how we help you set it up.
Read moreB2 control plan โ the formal control document
The B2 control plan is the formal document the structural engineer must approve under Denmark's QA order. We prepare it, ready for sign-off.
Read moreA5 as-built documentation
A5 as-built documentation shows what was actually built and how any deviations from the control plan were handled. We prepare it, ready for handover.
Read moreRead more in our knowledge base
What is a B3 control report?
The B3 control report documents that the control described in the B2 plan was actually carried out. See what it must contain, and why it often has gaps.
Read articleGet started
Call Kvalitetssikring Danmark ApS to keep your B3 control report up to date throughout the build.