Structural class 4 (KK4): third-party control and documentation under DS1140

Structural class 4 (KK4) is the highest structural class and covers structures in the high consequence class where failure would be particularly serious (CC3+). In KK4, BR18 requires self-inspection, independent control and third-party control, special control of the executed structure with a minimum sample of 50%, and declarations from both the certified structural engineer and the third-party inspector.

Technically reviewed by Kvalitetssikring Danmark ApS · Updated

Structural classes

The requirements in KK1, KK2, KK3 and KK4

The higher the structural class, the more control. Pick a class to see its control and documentation requirements.

Structural classes KK1–KK4 explained
  1. KK1

    CC1 and many detached houses

    Control
    Self-inspection
    Special control, sample
    No requirement
    Declarations
    No certified structural engineer
    Documentation
    A1–A4 and B1
    See the requirements
  2. KK2

    The default class for CC2

    Control
    Self-inspection and independent control
    Special control, sample
    At least 10%
    Declarations
    Certified structural engineer
    Documentation
    A1–A5 and B1–B3
    See the requirements
  3. KK3

    CC3 and complex CC2 structures

    Control
    Self-inspection and independent control, no exceptions
    Special control, sample
    At least 25%
    Declarations
    Certified structural engineer
    Documentation
    A1–A5 and B1–B3
    See the requirements
  4. KK4You are here

    CC3+, particularly serious consequences

    Control
    Self-inspection, independent and third-party control
    Special control, sample
    At least 50%
    Declarations
    Certified structural engineer and third-party inspector
    Documentation
    A1–A5 and B1–B3 with third-party parts

When is a building in KK4?

Under BR18 § 489, structures in the high consequence class where the consequences of failure are particularly serious (CC3+) belong to KK4. The class is set during design, and the certified structural engineer confirms in the start declaration that the classes have been chosen correctly.

What control does KK4 require?

BR18 Annex 3, table 1 requires all three control types in KK4:

  • Self-inspection: the person who carried out the work checks it. See Self-inspection under DS1140.
  • Independent control: someone who took no part in the design or execution of that specific work. See Independent control under DS1140.
  • Third-party control: someone with no direct or indirect financial or organisational ties to the firms that prepared or independently controlled what is being checked: the documentation (§ 526) or the execution of the load-bearing structures (§ 526 a).

What is third-party control?

Third-party control in KK4 covers both a physical inspection of the executed structure and a document check of the control documentation (Annex 3, table 1). Control of the documentation is carried out by a certified structural engineer acting as third-party inspector, at the level set in Annex 3, table 3. For control of the execution, the third-party inspector must have the necessary professional competence and overview (§ 528).

So third-party control is different from independent control: the independent inspector can come from the same company, but the third-party inspector must have no ties to any of the firms involved.

What does 50% mean in KK4?

BR18 Annex 3, table 2b sets a minimum sample of 50% for special control of the executed structure in KK4. Special control is additional control of particularly critical items, which are set out in the structural control plan for execution (B2). General control of the execution follows the control level in DS1140.

Start and final declarations

In KK4, the certified structural engineer prepares the start and final declarations, and the third-party inspector also issues their own start and final declarations (§§ 498–499). Since 1 January 2025, the structural engineer’s final declaration covers the control of the design and the special control of the execution, while the third-party inspector’s final declaration covers the third-party control of the design. General control of the execution is instead documented in a separate declaration at completion, stating that the control has been carried out and deviations dealt with (§ 41(3)).

What documentation do you hand over in KK4?

The structural documentation (§ 496): the relevant parts of A1–A5 and B1–B3 (§§ 500–502), where the control plan (B2) and control report (B3) also have separate parts for third-party control. For the contractor: the Control plan under DS1140, B2 control plan, B3 control report and A5 as-built documentation.

How to plan third-party control

  • Agree third-party control before construction starts. The inspector must be independent of every firm involved, so find and agree the assignment early.
  • Share the control plan. The third-party inspector needs to know the third-party part of B2, so physical inspections can be scheduled.
  • Schedule inspections before the structure is enclosed. What needs to be seen physically must be visible at the agreed time.
  • Keep the control documentation ready as you go. The document check is faster when records, photos and deviations are collected and traceable.

Common mistakes in KK4

  • Independent control and third-party control are mixed up. They are two separate requirements with different rules on independence.
  • Third-party control is planned too late. The physical inspection must happen while the structure can still be seen.
  • “50%” is read as the scope of all control. It only applies to the sample for special control.
  • The control documentation isn’t ready for the document check. Records without traceability slow the third party down.

How KS Danmark helps

We help main contractors, trade contractors and developers set up control that matches the structural class: from the control plan and self-inspection to independent control and the final handover package. We can take on the whole job or just the part you’re missing, anywhere in Denmark, and we explain the Danish requirements in English.

We can’t promise approval on anyone else’s behalf, and the formal classification and the certified roles sit with the responsible parties under BR18. But we make sure your control and documentation are structured, traceable and complete, based on the project material that exists.

Frequently asked questions

What is third-party control?

Control carried out by someone with no financial or organisational ties to the firms that prepared, executed or independently controlled the documentation or work being checked. In KK4 it covers a physical inspection and a document check.

Who can carry out third-party control?

Control of the documentation is carried out by a certified structural engineer. For control of the execution, the third-party inspector must have the necessary professional competence and overview (BR18 § 528).

What does 50% mean in KK4?

It is the minimum sample for special control of the executed structure (BR18 Annex 3, table 2b). General control follows DS1140.

Are independent control and third-party control the same?

No. The independent inspector can come from the same company if they didn’t take part in the work. The third-party inspector must have no ties to any of the firms involved.

When is a building in KK4?

When the structure is in the high consequence class where the consequences of failure are particularly serious (CC3+), under BR18 § 489.

Related pages

Independent control under DS1140

Does your structural class require independent control? We match you with an independent inspector in your region who knows the DS1140 requirements.

Read more

The control plan under DS1140

The control plan is the core of your DS1140 documentation. See what it must cover, how B2, B3 and A5 connect, and how we help you set it up.

Read more

B3 control report – documenting completed checks

The B3 control report documents that the checks in your B2 plan were carried out. We keep it current through the build, so nothing's missing.

Read more

Get started

Send us your project material or control plan, and we’ll come back with an assessment of what the structural class requires of your control and documentation.