DS1140 support on Sjælland
Need DS1140 support for a project on Sjælland (Zealand)? KS Danmark helps organise control plans, control reports and records from the execution of load-bearing structures. We start with your project documents, the division of responsibilities and the questions that need resolving.
Technically reviewed by Kvalitetssikring Danmark ApS · Updated
Bringing separate work packages into one handover
When several contractors supply records for one project, information can end up in different places. One party holds the drawings, another keeps the photos, and comments from the structural engineer may sit in an email thread. It then becomes difficult to identify which work the records cover and what is missing.
DS1140 support on Sjælland can begin by clarifying those deliverables. Which structural sections are involved? Who carried out the work? Which records already exist? We help bring those questions together before the submission is assembled.
A control plan that reflects the work
A control plan needs to be usable by the people carrying out and following up the checks. It should reflect the project requirements and the stage of construction. A generic template is only a starting point. Specific checks, responsible people and recording requirements need to be agreed for the work package.
Send the current plan with the relevant drawings and specifications. We can then discuss where the scope needs clarification and how records should relate to the work. Changes to the project also need to be reflected in its documentation.
Making photos and records traceable
A photo is most useful when it can be connected to a location, a date and the relevant check. This matters particularly when the work will later be concealed. Records should follow a shared structure so that finding evidence does not depend on who saved it.
For projects on Sjælland, we discuss the documentation process using the project address and the work required. The location alone does not establish whether attendance is necessary. Tell us what needs checking, how far construction has progressed and which deadlines apply.
Responding to comments on existing documents
If you have received comments on a control report, send the report and the original feedback together. Rewriting a document may not resolve the underlying issue. The link between a requirement and its supporting evidence may be missing.
We can help organise the comments and identify missing information. A check that did not take place cannot be replaced by a later statement claiming that everything was inspected. The appropriate next step depends on the actual circumstances and the people responsible for the project.
Projects across Zealand
This page is for projects on Sjælland (Zealand) outside Copenhagen, for example in Roskilde, Køge, Hillerød, Helsingør, Næstved and Slagelse, or elsewhere on the island. Include the town and address in your enquiry. Projects in Københavns Kommune have their own page on DS1140 in Copenhagen.
There is no separate DS1140 rulebook for each town. The building case is handled by the municipality where the project is, but the structures, documentation and agreed controls determine the task. Our office is in Odense, and we have consultants on Sjælland.
What to send with your enquiry
Describe your role and provide the site address on Sjælland. Include current drawings, the control plan and any comments on documents already submitted. Tell us which work is complete and which activities have not started.
This gives us a basis for discussing a defined task rather than beginning with a general review of everything. You may need help with a plan, report organisation or gaps before the next submission. Pricing and timing depend on the agreed scope.
Include a clear document register
Prepare a register of the files you submit and identify the part of the project each file concerns. Where several contractors contribute, use names that distinguish their work packages. This helps the recipient see whether an attachment is missing or stored elsewhere. A revised submission should also identify what changed since the previous version. Keep the original feedback alongside the new documents so the review history remains understandable and the team does not need to guess which comments have been addressed.
DS1140 support across Denmark
Choose the region your project is in and include the site address in your enquiry. Scope and any site attendance are agreed for each task.
DS1140 Jylland
Jutland, e.g. Aarhus, Aalborg and Esbjerg
View pageDS1140 Aarhus
Projects in Aarhus Kommune
View pageDS1140 Fyn
Funen, e.g. Odense, where our office is
View pageDS1140 Copenhagen
Projects in the City of Copenhagen
View page- You are here
DS1140 Sjælland
Zealand, e.g. Roskilde, Køge and Hillerød
Frequently asked questions
Can you help with DS1140 on Sjælland?
Yes. Send the site address and a description of the task, and we will clarify what support you need and how to carry it out.
Do you have an office on Sjælland?
No. Our office is in Odense, and we have consultants on Sjælland (Zealand). Many tasks can be handled by reviewing the material, and site attendance is agreed for each task.
Which towns on Sjælland do you cover?
All of Sjælland (Zealand), for example Roskilde, Køge, Hillerød, Helsingør, Næstved and Slagelse. Projects in Copenhagen have their own DS1140 Copenhagen page.
What should we send with an enquiry?
Send current drawings, the control plan, available site records and any comments. Include your role, the deadline and which work is complete. This helps define the task and the information needed.
Do you guarantee that the documentation will be approved?
No. We agree the support and deliverables with you, but we do not promise an outcome on behalf of the structural engineer or the authority. The other project parties keep their own assessments and responsibilities.
How much does support cost, and how soon can you start?
It depends on the amount of material and the deliverables you need. Send the project details and your deadline, and we will give you a price and an expected start date.
Related pages
DS1140 help: has your case hit a wall?
Need DS1140 help? Control plan rejected, B2 rejected, or missing B3 documentation? We take over stalled DS1140 cases and get them approved.
Read moreThe control plan under DS1140
The control plan is the core of your DS1140 documentation. See what it must cover, how B2, B3 and A5 connect, and how we help you set it up.
Read moreB3 control report – documenting completed checks
The B3 control report documents that the checks in your B2 plan were carried out. We keep it current through the build, so nothing's missing.
Read moreContact
Need DS1140 support on Sjælland? Call +45 40 10 57 20 or send an enquiry with the site address, your role and the documents you need reviewed.