Kvalitetssikring Danmark ApS
Free tool

Tender control plan check

Find out whether the inspection requirements of the tender and the project are actually built into your own QA plan, and where clarification is needed before or during execution.

22 questionsVersion 1.0Free · no registration

How to assess each item

Missing
A specific requirement can be identified but is not built into your own QA/control plan.
Unclear
The requirement exists, but one or more significant parameters are unclear: scope/frequency, location, timing, method, acceptance criterion, responsibility or documentation.
Clarified
The requirement is sufficiently specific and built into your own QA/control plan.
Not relevant
Only where the item genuinely does not apply to the project.

The result is an overview of gaps and items to clarify, not a percentage assessment or certification.

0 of 22 answered
  1. 1.Basis and revisionsIs it clear which tender documents, specifications, drawings and revisions the inspection is to be based on?
  2. 2.ResponsibilityIs it clear who carries out, documents, follows up and approves/closes the individual inspections?
  3. 3.Inspection pointIs it specifically described what is to be inspected?
  4. 4.Scope of inspectionIs the scope/frequency sufficiently defined, or does it merely say, for example, “to be inspected” without quantity/frequency?
  5. 5.LocationIs it clear where the inspection is to be carried out or how samples/areas are selected?
  6. 6.TimingIs it clear when the inspection is to take place, especially before concealed or covered works?
  7. 7.Inspection methodIs it clear how the inspection is carried out: visual, measurement, test, document check or another method?
  8. 8.Acceptance criterionIs it clear what the result is to be assessed against: drawing, tolerance, specification, manufacturer's instructions, standard or another agreed basis?
  9. 9.Form of documentationIs it clear which documentation is required: photo, measurement, form, report, product documentation or other?
  10. 10.Receiving inspection: deliveriesHave requirements for relevant materials/products and the associated documentation been identified?
  11. 11.Receiving inspection: other tradesHas a position been taken on taking over the working basis from preceding trades and on handling visible/ascertainable problems?
  12. 12.In-process inspectionHave critical and concealed works been identified, so that they are inspected before they can no longer be seen?
  13. 13.Photos/measurementsIs it clear which photos/measurements are required, where and with what traceability?
  14. 14.Product documentationIs it clear which product/material documents are to be collected and handed over?
  15. 15.DeviationsIs there an agreed process for recording, assessment, decision, remedy, inspection and closure?
  16. 16.Technical queriesIs there a process for questions about unclear/contradictory design documents, including recipient, answer, confirmation, implementation and closure?
  17. 17.SubcontractorsHave inspection and documentation requirements been passed on to relevant subcontractors, and has responsibility for follow-up been set?
  18. 18.Ongoing handover / on-account paymentHas it been clarified whether QA documentation is to be handed over on an ongoing basis or in connection with payment applications, and if so what/when/to whom?
  19. 19.Final inspectionHas a final inspection been set, so that completion and recorded condition are documented before notification of completion?
  20. 20.Master reviewIs an internal review before pre-handover/handover planned, including recording and closing your own defects?
  21. 21.Handover packageIs it clear exactly which QA and product documentation is to be handed over on completion?
  22. 22.Unclarified requirementsHave all yellow/unclear items been gathered in a list for the building owner/consultant, with person responsible and requested response deadline?

Answer the last 22 questions to see the result.

Your answers are only stored in this browser until you close the tab. We do not see them unless you choose to download the report.

The tool is practical guidance and does not replace a review of the specific contract and the specific tender and design documents.