Tender control plan check
Find out whether the inspection requirements of the tender and the project are actually built into your own QA plan, and where clarification is needed before or during execution.
22 questionsVersion 1.0Free · no registration
How to assess each item
- Missing
- A specific requirement can be identified but is not built into your own QA/control plan.
- Unclear
- The requirement exists, but one or more significant parameters are unclear: scope/frequency, location, timing, method, acceptance criterion, responsibility or documentation.
- Clarified
- The requirement is sufficiently specific and built into your own QA/control plan.
- Not relevant
- Only where the item genuinely does not apply to the project.
The result is an overview of gaps and items to clarify, not a percentage assessment or certification.
Answer the last 22 questions to see the result.
Your answers are only stored in this browser until you close the tab. We do not see them unless you choose to download the report.
The tool is practical guidance and does not replace a review of the specific contract and the specific tender and design documents.
All free tools
Free QA handbookUse the structure as a starting point for the company's or the construction project's own QA handbook. Always adapt the content to the construction contract, the tender documents, the project, the trades and the specific inspection requirements.Quality assuranceQuality assurance in constructionGet quality assurance under control from start-up to handover© 2026 Kvalitetssikring Danmark ApS. All rights reserved. The tool's original structure, help texts, classifications, result model and report presentation may not be copied or used commercially without written permission.