Free QA handbook for construction: structure, inspection and documentation

Use the structure as a starting point for the company's or the construction project's own QA handbook. Always adapt the content to the construction contract, the tender documents, the project, the trades and the specific inspection requirements.

Version 1.0October 28, 2026Free · no registration

Please note: The handbook is a template and guidance. It is not a project-specific approval or legal advice.

Download the handbook as a PDF

The PDF version has a cover page, a table of contents, all 18 chapters and fields you can fill in for the company or the construction project.

  1. Chapter 1

    Purpose and scope

    Describe what the handbook applies to: company, project, contract/trade and which activities it covers. Also state any significant limitations.

  2. Chapter 2

    Organisation and responsibility

    State the project manager, site foreman, QA manager and other roles. Describe who carries out inspections, who follows up and who can close records.

  3. Chapter 3

    Design and contract basis

    List the contract/order, tender documents, specifications, drawings, revisions, manufacturer's instructions and other basis. It must be possible to see which material the inspection is based on.

  4. Chapter 4

    Document control

    Describe how current drawings and documents are identified, distributed, updated and archived, so that superseded revisions are not used.

  5. Chapter 5

    Control plan and scope of inspection

    Turn the project's requirements into specific inspections. For each item: what, where, when, who, scope/frequency, inspection basis, acceptance criterion and documentation. Unclear requirements are marked for clarification.

  6. Chapter 6

    Start-up with those doing the work

    Plan a short start-up/briefing with the relevant tradespeople. Go through critical works, concealed works, tolerances, documentation requirements, deviations and who to contact in case of doubt.

  7. Chapter 7

    Receiving inspection: materials and products

    Inspect relevant deliveries for identity, quantity, visible damage, documentation, storage and conformity with the project/order, where relevant.

  8. Chapter 8

    Receiving inspection: taking over from other trades

    Record the working basis your own work takes over: completion, dimensions/levels, tolerances, surfaces, accessibility and other preconditions. Visible/ascertainable problems are recorded and notified before the work continues.

  9. Chapter 9

    In-process inspection

    Set out inspections while the work is accessible, especially before concealed/covered works are closed up. Link the inspection to location, drawing/revision, requirement and result.

  10. Chapter 10

    Photo and measurement documentation

    Photos must be traceable and relevant. State what the photo/measurement documents, location, date, inspection point and any dimension/tolerance. Avoid unsorted photo collections without context.

  11. Chapter 11

    Product and material documentation

    Collect relevant data sheets, declarations of performance, certificates, installation instructions or other project-relevant product documentation, where required.

  12. Chapter 12

    Deviations

    Use a separate deviation log. Minimum: ID, date, location, description, reference, photo, consequence/assessment, person responsible, decision, remedy, inspection and closure date.

  13. Chapter 13

    Technical queries

    Use a separate RFI/technical query log. Minimum: question, location, project/drawing reference and revision, why clarification is required, recipient/party with authority to decide, date, response deadline, answer/decision, implementation and closure.

  14. Chapter 14

    Subcontractors

    Describe how subcontractors' QA requirements are communicated, followed up and collected, and who checks that the agreed documentation is received.

  15. Chapter 15

    Final inspection

    Document the completion and recorded condition of your own work before notification of completion: visible damage/defects, remaining items, relevant surfaces/details, date and photo where relevant.

  16. Chapter 16

    Master review

    Carry out an internal systematic review before pre-handover/handover. Record your own errors, defects and remaining works, person responsible and deadline, and close them before handover where possible.

  17. Chapter 17

    Handover

    Define the handover package and responsibility: QA reports, logs, product documentation, relevant declarations, as-built material where agreed, open/closed issues and version status.

  18. Chapter 18

    Archiving and version control

    Set out the file structure, naming, version history, access and final archiving, so that the documentation can later be found again and understood.

All free tools

Tender control plan checkFind out whether the inspection requirements of the tender and the project are actually built into your own QA plan, and where clarification is needed before or during execution.Quality assuranceQuality assurance in constructionGet quality assurance under control from start-up to handover