Kvalitetssikring Danmark ApS
Free tool

B2 Control Plan Check

Is your B2 control plan clear and usable?

Check whether the B2 control plan provides a usable basis for planning, carrying out and documenting the relevant controls.

Professional basis reviewed: October 23, 2026Version 1.0Free · no registration

Please note: This tool is a professional screening. The result is not an approval, certification or project-specific liability assessment and does not replace required professional control or the work of the certified structural engineer.
B2 is subject to maximum independent control (Maks.) in KK2, KK3 and KK4.[9]
What are you checking?
0 of 25 answered
  1. 1.Is it clear which part of the building/structural section the control plan covers?[1]
    [K/V]
  2. 2.Is the relevant control basis identified?[2]
    [V]
  3. 3.Are relevant drawings, models, descriptions or other documents identifiable?[2]
    [V]
  4. 4.Can the current revision/version of the control basis be identified?[2]
    [V/P]
  5. 5.Are relevant interfaces with other structural sections or works handled?[3]
    [K/V]
  6. 6.Are the relevant control objects identified?[2]
    [V]
  7. 7.Are the control points sufficiently unambiguous?[2]
    [V]
  8. 8.Is the control type stated?[4]
    [K]
  9. 9.Is the control level stated?[4]
    [K]
  10. 10.Is the control scope stated?[4]
    [K]
  11. 11.Is the documentation requirement stated?[4]
    [K]
  12. 12.Is the organisation/person for the control stated?[4]
    [K]
  13. 13.Is the control method stated or otherwise unambiguously determined?[2]
    [V]
  14. 14.Is the acceptance criterion sufficiently clear to assess the result?[2]
    [V]
  15. 15.Is it clear what documentation the control is to result in?[4]
    [K/V]
  16. 16.Can the control be carried out at the time when the control point is accessible?[2]
    [V/P]
  17. 17.Is the control practically possible to carry out with the described basis?[2]
    [V/P]
  18. 18.Is it clear which controls are carried out as self-inspection?[2]
    [K/V]
  19. 19.Are relevant independent controls identified?[5]
    [K/V]
  20. 20.Is the control level/scope determined in accordance with the project's structural class and control basis?[6]
    [K]
  21. 21.Is any special control identified separately from general control?[7]
    [K/V]
  22. 22.Has it been clarified how deviations found in the control are recorded and handled?[4]
    [K/V]
  23. 23.Is the control plan updated to the current stage of the construction?[4]
    [K]
  24. 24.Have changes to the design/execution basis been incorporated or handled in the control plan?[4]
    [K/V]
  25. 25.Is it possible to trace the current revision/version of the control plan?[8]
    [V/P]

Answer the last 25 questions to see the result.

Your answers are only stored in this browser until you close the tab. We do not see them unless you choose to download the report.

Sources and professional basis

  1. [1]BR18 § 502 – the structure of the structural documentation, including A4, A5, B2 and B3 (current version) bygningsreglementet.dk/Ovrige-bestemmelser/28/Krav/494_505
  2. [2]Bygningsreglementets vejledning til kapitel 30 – Kontrol af dokumentation for og udførelse af bærende konstruktioner (Guidance to the Building Regulations, chapter 30 – Control of documentation for and execution of load-bearing structures), 23.01.2025, Social- og Boligstyrelsen bygningsreglementet.dk/media/f2rp4fj1/bygningsreglementets-vejledning-til-kapitel-30-kontrol-af-dokumentation-for-og-udfoerelse-af-baerende-konstruktioner_23-01-25.pdf
  3. [3]BR18 chapter 28, §§ 494-505 – Documentation of load-bearing structures (current version), Social- og Boligstyrelsen (Danish Social and Housing Authority) bygningsreglementet.dk/Ovrige-bestemmelser/28/Krav/494_505
  4. [4]BR18 § 523 – control, control plans, deviations, documentation and updating (current version) bygningsreglementet.dk/Ovrige-bestemmelser/30/Krav/523_528
  5. [5]BR18 Annex 3 – tables for control types and control levels (current version) bygningsreglementet.dk/bilag/b3/bilag_3/
  6. [6]BR18 § 527 (current version) – subsections 4 and 6 apply; the former subsections 3 and 5 were repealed on 1 April 2024 bygningsreglementet.dk/Ovrige-bestemmelser/30/Krav/523_528
  7. [7]BR18 Annex 3, table 2b – special control of the execution: random samples of 10 % / 25 % / 50 % in KK2 / KK3 / KK4; general control according to DS 1140 (current version) bygningsreglementet.dk/bilag/b3/bilag_3/tabel_2b/
  8. [8]KS Danmark professional practice. The item is not a separate statutory requirement; it supports traceability, usability or practical execution of the control.
  9. [9]BR18 Annex 3, table 2a – level of independent control of the structural documentation (current version) bygningsreglementet.dk/bilag/b3/bilag_3/tabel_2a/

Basis

[K]
Requirement in the current BR18
[V]
Official guidance to the Danish Building Regulations
[S]
Standard basis (DS 1140) – exact clauses are checked against the licensed standard
[P]
KS Danmark professional practice – a recommendation, not a statutory requirement

Professional basis reviewed: October 23, 2026 · Version 1.0